Time: 8:00 am - 3:00 pm
Location: : Abbotsford Campus
Facilities Management will be doing annual generator testing.
The generators in Abbotsford (buildings A East, B, and Friesen House) will be tested on Friday, December 19th between 8:00 AM and 3:00 PM.
During the testing, the equipment on the generator will see a brief loss of power when the incoming power is shut off until the generator comes on. The same will happen on the transfer back from generator to incoming power.
The generators in Chilliwack (CEP buildings A and T) will be tested on Monday, December 22nd between 7:00 AM and 3:00 PM.
During the testing, the equipment on the generator will see a brief loss of power when the incoming power is shut off until the generator comes on. The same will happen on the transfer back from generator to incoming power. During this test, the emergency power feed to the Agriculture Building will be verified.
If you think that your area is powered from the generator, please shut off any sensitive equipment that is on the generator circuit prior to the generator testing to make sure the equipment isn’t damaged.
If you have any questions, feel free to contact Sheldon Marche at Ext. 4606.
Event Location : Abbotsford Campus
Map UnavailableUFV Generator testing
Date(s): Friday, December 19Time: 8:00 am - 3:00 pm